🛣️ Sampling of bituminous mixtures — PN-EN 12697-27

Construction PN-EN 12697-27

In short

The standard describes an ACTIVITY, not a measurement: ten ways of sampling bituminous mixtures — from a truck, from beneath the paver augers, from a stockpile, from a laid layer, by coring. The test is performed according to PN-EN 12697-27:2017-07 (wersja angielska; wprowadza EN 12697-27:2017 [IDT]); Status of the document (22-09-2026): Current edition: PN-EN 12697-27:2017-07. PKN card without a "Data wycofania" [withdrawal date] row; the 2005 edition together with amendment Ap1:2013-12 withdrawn 18-07-2017. The procedure comprises 8 steps; it is used for: Sampling for testing the composition and physical properties of bituminous mixtures, Control of mix deliveries on site — sampling from a truck load, Control of laying — sampling from beneath the paver augers and from a laid but uncompacted layer.

At a glance

  • Standard: PN-EN 12697-27:2017-07 (wersja angielska; wprowadza EN 12697-27:2017 [IDT])
  • Category: Construction
  • Procedure steps: 8
  • Status of the document (22-09-2026): Current edition: PN-EN 12697-27:2017-07. PKN card without a "Data wycofania" [withdrawal date] row; the 2005 edition together with amendment Ap1:2013-12 withdrawn 18-07-2017
  • How far the text of the standard that we have extends: The extract covers the European foreword with the list of significant changes, the list of parts of the series, the full table of contents and clauses 1–4.4 (scope, references, definitions, sampling from a truck, mastic asphalt, paver augers, stockpile). Clauses 4.5–4.10 and clauses 5 and 6 — including the content of the sampling report — are NOT included
  • Sampling from a truck load — shovel or scoop: minimum 4 increments: approx. 2 kg each for nominal aggregate size ≤ 16 mm, approx. 3 kg each for aggregate > 16 mm — For mixtures with aggregate ≥ 32 mm, eight increments are recommended

Overview

THIS IS AN ENTRY ABOUT SAMPLING, THAT IS, ABOUT AN ACTIVITY — AND THAT IS ALSO HOW THIS STANDARD IS CITED IN ACCREDITATION SCOPES. The scope line then reads "Pobieranie próbek" [sampling], not "Oznaczanie…" [determination of…], and there is no measuring range or unit with it, because there is nothing to measure. This is not a lack of data, but a different role of the document.

SCOPE, QUOTED FROM THE TEXT OF THE STANDARD (clause 1): "This European Standard specifies test methods for sampling bituminous mixtures for roads and other paved areas to determine their physical properties and composition."

A CHANGE THAT IS VISIBLE IN THE TITLE ITSELF BUT EASY TO OVERLOOK. The PN-EN 12697-27:2005 edition bore the title "Mieszanki mineralno-asfaltowe — Metody badań mieszanek mineralno-asfaltowych NA GORĄCO — Część 27: Pobieranie próbek" [Bituminous mixtures — Test methods for HOT mix asphalt — Part 27: Sampling]. The 2017-07 edition bears the title without this element: "Mieszanki mineralno-asfaltowe — Metody badań — Część 27: Pobieranie próbek" [Bituminous mixtures — Test methods — Part 27: Sampling]. The standard itself lists this as the first of the significant changes: "the title no longer makes the method exclusively for hot mix asphalt". The document has therefore ceased to be limited to hot mixes — and a laboratory that copies the title from an old accreditation scope narrows it contrary to the standard.

THE SECOND CHANGE OF THE 2017 EDITION IS NUMERICAL AND CONCERNS DAILY WORK: THE INCREMENTS HAVE BEEN REDUCED. When sampling from a truck and from a stockpile — for material with a nominal aggregate size not greater than 16 mm from 3 kg to 2 kg, and for aggregate larger than 16 mm from 7 kg to 3 kg. When sampling from beneath the paver augers — from 7 kg to 3 kg. A laboratory working according to the 2005 edition therefore takes up to more than twice as much material as the edition in force requires. The 2017 edition also added a tool: a stainless steel sampling tube, together with its own procedure, and a new method of sampling — from the paver material hopper (new clause 4.10).

FOUR SAMPLE NAMES THAT DO NOT MEAN THE SAME THING. The standard defines them separately, and this distinction is its core: • INCREMENT — a single quantity of material taken from a larger mass of the material being sampled. • BULK SAMPLE — a sample formed by COMBINING increments, in a quantity sufficient for all intended purposes. • REPRESENTATIVE SAMPLE — a sample consisting of a SPECIFIED NUMBER of increments, taken deliberately so that it represents a specified quantity or a specified area of material. The standard adds that it is assumed to have the same composition as the material being sampled — within the precision associated with the method of sampling. • SPOT SAMPLE — a sample taken in one operation, at one place and time. Here the standard makes a reservation that decides the value of such a sample: if the homogeneity of the material can be assumed, a spot sample may be regarded as representative; if the material is not homogeneous, it is representative only of a limited area around the sampling point. • LABORATORY SAMPLE — a sample sent to the laboratory; it may be the whole or part of a bulk or representative sample and is assumed to be sufficient for all the required tests. A PRACTICAL CONSEQUENCE OF THIS: a report saying "sample taken according to PN-EN 12697-27" does not yet say whether the sample is representative. That depends on the number and distribution of the increments, not on citing the standard.

THE NUMBER OF INCREMENTS IS A MINIMUM, NOT A SET VALUE. The standard repeats this for successive methods: "The number of increments specified is a minimum and more may be necessary in some circumstances." Going below the given number is a deviation from the standard; exceeding it is not.

WHAT WE DO NOT GIVE IN THIS ENTRY. The standard describes ten methods of sampling materials other than coated chippings (clause 4) and, separately, the sampling of chippings from stockpiles (clause 5) and the marking and packing of laboratory samples together with the sampling report (clause 6). The text we read covers clauses 1–4.4; the details of the methods from 4.5 (sampling from a laid but uncompacted layer — using trays and using a shovel or scoop), 4.7 (cores), 4.8 (cutting slabs), 4.9 (drag-slat conveyor of a continuous mixing plant), 4.10 (paver hopper), as well as of clauses 5 and 6, including the content of the sampling report, WE DO NOT GIVE — we know only their names from the table of contents of the standard.

Method principle

Several increments of a specified mass are taken from the mass of material, from places distributed as widely as possible and from beneath the surface layer, and then combined into a bulk sample. The method of sampling is chosen according to the place and state of the material: transport, paver, stockpile, laid but uncompacted layer, compacted layer (core or cut slab), plant conveyor. The number and distribution of the increments decide whether the sample is representative.

Applications

Key parameters

ParameterValue
Status of the document (22-09-2026)Current edition: PN-EN 12697-27:2017-07. PKN card without a "Data wycofania" [withdrawal date] row; the 2005 edition together with amendment Ap1:2013-12 withdrawn 18-07-2017
How far the text of the standard that we have extendsThe extract covers the European foreword with the list of significant changes, the list of parts of the series, the full table of contents and clauses 1–4.4 (scope, references, definitions, sampling from a truck, mastic asphalt, paver augers, stockpile). Clauses 4.5–4.10 and clauses 5 and 6 — including the content of the sampling report — are NOT included
Sampling from a truck load — shovel or scoopminimum 4 increments: approx. 2 kg each for nominal aggregate size ≤ 16 mm, approx. 3 kg each for aggregate > 16 mm — For mixtures with aggregate ≥ 32 mm, eight increments are recommended
Sampling from a truck load — depth and spacingapprox. 100 mm below the surface of the material, from places distributed as widely as possible, not closer than 300 mm to the side — Surface material — together with coarse particles that could fall into the hole — is removed before sampling
Sampling from a truck load — sampling tubeminimum 3 increments of approx. 4 kg each; not closer than 0.5 m to the side; the tube is pushed in horizontally far enough for it to fill completely — Size M must not be used for nominal aggregate sizes greater than 16 mm. The truck should be loaded to at least half its volume with current material
Sampling from beneath the paver augers2 increments of approx. 3 kg each from EACH side of the paver, 4 increments in total — Sampling is done only when the augers are covered along their entire length
Sampling from a stockpile of workable materialminimum 4 increments: approx. 2 kg each for aggregate ≤ 16 mm, approx. 3 kg each for aggregate > 16 mm, from different places, at least 100 mm from the surface of the stockpile — For less cohesive materials, pushing in a metal plate is recommended so that surface material does not slide into the hole
Mastic asphalt during discharge2 increments at the outlet of the mixer, AFTER one third of the contents has been discharged; a pat of a size meeting the minimum of EN 12697-20 is formed immediately — A bucket must not be used — coarse particles settle during collection. The moulds are lined with silicone paper, aluminium foil or PTFE or coated with a limestone filler slurry
Direction of the limit for the numbers of incrementsthese are MINIMUM VALUES — the standard allows that in some circumstances more are needed
What builds representativeness in this standard — and why it is not the same everywhereHERE it is built by the NUMBER AND DISTRIBUTION of increments from material that is already mixed (mix in a load, in a stockpile, beneath the augers) — which is why a larger number of increments improves the sample, and the numbers given above are minimums. THIS IS NOT A FEATURE OF ALL SAMPLING STANDARDS: when sampling ground and soil, representativeness is decided by the CHOICE OF AREA before the first increment, and averaging material from heterogeneous places spoils the result all the more, the more increments are averaged. A comparison based on the entry on PN-R-04031 in this database (which rests on a contractor's instruction, not on the text of the standard) — the difference is one of KIND, not of degree
Change in increment size introduced by the 2017 editionfrom 3 kg to 2 kg (aggregate ≤ 16 mm) and from 7 kg to 3 kg (aggregate > 16 mm) when sampling from a truck and from a stockpile; from 7 kg to 3 kg at the paver augers — Listed in the foreword of the standard as significant changes compared with EN 12697-27:2000
Change of title introduced by the 2017 editionthe limitation to HOT mixes has been removed — Quotation from the foreword: "the title no longer makes the method exclusively for hot mix asphalt"
Methods of sampling described in the standard10 methods in clause 4 (materials other than coated chippings) + sampling of coated chippings from stockpiles (clause 5) — The content of the methods from 4.5 to 4.10 (sampling from a laid layer, cores, cutting slabs, drag-slat conveyor, paver hopper) and of clauses 5 and 6 is NOT quoted in this entry: the text of the standard that we read ends at 4.4, and of the further clauses we know only the names from the table of contents

Standard

Standard number
PN-EN 12697-27:2017-07 (wersja angielska; wprowadza EN 12697-27:2017 [IDT])
Title (PL)
Mieszanki mineralno-asfaltowe — Metody badań — Część 27: Pobieranie próbek
Title (EN)
Bituminous mixtures — Test methods — Part 27: Sampling

Step-by-step procedure

  1. Choice of the method of sampling

    The method is chosen according to the place and state of the material: truck load, discharge of mastic asphalt, paver augers, stockpile, laid but uncompacted layer, compacted layer, plant conveyor, paver hopper. Clause 5 deals separately with coated chippings.

  2. Choice of tool

    The scoop is used for materials with a nominal size of up to 16 mm, the shovel more widely, the sampling tube — with size M limited to aggregate not larger than 16 mm.

  3. Determining the number and mass of increments

    For sampling from a truck and from a stockpile: minimum four increments of approximately 2 kg each (aggregate ≤ 16 mm) or approximately 3 kg each (aggregate > 16 mm); for mixtures with aggregate ≥ 32 mm, eight increments are recommended. With the tube — minimum three increments of approximately 4 kg each. From beneath the paver augers — two increments of approximately 3 kg each from each side.

  4. Removal of surface material

    Before sampling, the material is removed from the surface together with coarse particles that could fall into the hole. For less cohesive materials, pushing in a metal plate is recommended to make digging to a depth of 100 mm easier.

  5. Taking the increments

    Increments are taken from places distributed as widely as possible: from a truck — approximately 100 mm below the surface and not closer than 300 mm to the side (and with the tube not closer than 0.5 m); from a stockpile — at least 100 mm from its surface; from beneath the augers — only when they are covered along their entire length, pushing the shovel into the material in front of the auger.

  6. Combining into a bulk sample

    The increments obtained are combined to form a bulk sample. The number of increments given is a minimum — in some circumstances more are needed.

  7. Special procedure for mastic asphalt

    Two increments are taken at the outlet of the mixer after one third of the contents has been discharged, and a pat of a size meeting the requirements of EN 12697-20 is formed from them immediately. Sampling the material discharged first and last is avoided — unless the aim is to test precisely that part of the discharge.

  8. Marking, packing and sampling report

    Laboratory samples are marked and packed in accordance with clause 6 of the standard, which also covers the sampling report. WE DO NOT QUOTE THE CONTENT OF THIS CLAUSE IN THIS ENTRY — we did not have it in the text we read.

Required equipment and apparatus

EquipmentExampleIndicative price
Sampling shovelThe form shown in Figure 1 of the standard; the 2017 edition added a new type of it—
Sampling scoop (Fig. 2)For materials with a nominal size of 16 mm and smaller—
Stainless steel sampling tube in sizes M and N (Figs. 3 and 4)Introduced by the 2017 edition; size M is not suitable for aggregate above 16 mm—
Shaft approximately 2 m long for the shovelWhen access is obstructed by structural elements of the paver—
Metal plate pushed into the materialSo that surface material does not slide into the hole with less cohesive materials—
Moulds for mastic asphalt (for example an aluminium dish) with a lining: silicone paperAluminium foil, PTFE or a coating of limestone filler slurry—
Core drill for cores and saw for cutting slabsWhen sampling from a compacted layer—
Trays for sampling from a laid layerBut uncompacted—
Packaging for laboratory samples together with marking (clause 6 of the standard)—

Health and safety (OHS)

Frequently asked questions

Which standard describes this test?

The test is performed according to PN-EN 12697-27:2017-07 (wersja angielska; wprowadza EN 12697-27:2017 [IDT]) — “Bituminous mixtures — Test methods — Part 27: Sampling”.

How does this method work?

Several increments of a specified mass are taken from the mass of material, from places distributed as widely as possible and from beneath the surface layer, and then combined into a bulk sample. The method of sampling is chosen according to the place and state of the material: transport, paver, stockpile, laid but uncompacted layer, compacted layer (core or cut slab), plant conveyor.

What is the measuring range and accuracy?

Status of the document (22-09-2026): Current edition: PN-EN 12697-27:2017-07. PKN card without a "Data wycofania" [withdrawal date] row; the 2005 edition together with amendment Ap1:2013-12 withdrawn 18-07-2017; How far the text of the standard that we have extends: The extract covers the European foreword with the list of significant changes, the list of parts of the series, the full table of contents and clauses 1–4.4 (scope, references, definitions, sampling from a truck, mastic asphalt, paver augers, stockpile). Clauses 4.5–4.10 and clauses 5 and 6 — including the content of the sampling report — are NOT included; Sampling from a truck load — shovel or scoop: minimum 4 increments: approx. 2 kg each for nominal aggregate size ≤ 16 mm, approx. 3 kg each for aggregate > 16 mm — For mixtures with aggregate ≥ 32 mm, eight increments are recommended; Sampling from a truck load — depth and spacing: approx. 100 mm below the surface of the material, from places distributed as widely as possible, not closer than 300 mm to the side — Surface material — together with coarse particles that could fall into the hole — is removed before sampling.

How long does the test take?

The procedure comprises 8 steps. The standard does not give a duration for every stage — the laboratory's own procedure decides.

What equipment is required?

Sampling shovel, Sampling scoop (Fig. 2), Stainless steel sampling tube in sizes M and N (Figs. 3 and 4), Shaft approximately 2 m long for the shovel, Metal plate pushed into the material, Moulds for mastic asphalt (for example an aluminium dish) with a lining: silicone paper, Core drill for cores and saw for cutting slabs, Trays for sampling from a laid layer, Packaging for laboratory samples together with marking (clause 6 of the standard).

Where is this test used?

Sampling for testing the composition and physical properties of bituminous mixtures; Control of mix deliveries on site — sampling from a truck load; Control of laying — sampling from beneath the paver augers and from a laid but uncompacted layer; Assessment of the finished layer — taking cores or cutting slabs from the compacted pavement; Factory production control at an asphalt mixing plant — sampling from the drag-slat conveyor of a continuous plant; Mastic asphalt — sampling during discharge from the transport mixer, with the forming of a pat; Coated chippings — sampling from stockpiles (a separate clause of the standard).

What safety precautions apply?

Hot bituminous mixture has a temperature of the order of 140–180 °C — sampling requires heat-resistant gloves and clothing, and contact with the binder risks severe burns, because bitumen sticks to the skin; Sampling from beneath the paver augers takes place with the machine running — coordination with the operator and keeping a distance from moving parts are mandatory; Sampling from a truck load requires climbing onto the body or reaching over it — risk of falling from a height and of being crushed when the vehicle moves off; Work on an active road construction site — traffic of machines and vehicles; high-visibility clothing and securing of the sampling place are required; Hot bitumen fumes irritate the respiratory tract and the eyes; discharge of mastic asphalt from the transport mixer is a separate source of fumes; Core drilling and cutting of the pavement — hazards from silica dust, noise and hand-transmitted vibration.

Which laboratory can perform this test?

The test is performed by laboratories accredited to ISO/IEC 17025. On LabCoda you can find them by the standard number PN-EN 12697-27.

🔍 Find a laboratory performing this test